North House Mini Compound “Al Riyadh Misr 1” Bait Al-Watan New Cairo
Location of the Mini Compound, Al Riyadh Misr – North House
The project is located in the northern Beit El Watan area, south of the Suez Road. It is distinguished by its geographical location, steps away from the Suez Road and near the club area and the most prestigious urban communities such as: (Sharbatly Villas Compound, Al-Karfol, Palm Hills, and Mountain View). The width of the street is 30 m, in addition to its proximity to the services area and green areas.
Features of the mini compound project in Riyadh, Egypt 1
It overlooks the largest garden in Beit Al Watan
Ground floor and three floors, two apartments per floor only.”
Seafront
Steps from 90th Street
Features of North Beit Al Watan “south of Suez Road”:
Its prime location is in front of Shorouk City.
Steps from the (Egypt-Suez) desert road.
Steps from North 90th Street.
Its proximity to New Cairo and the administrative capital.
Steps from Al Ahly Club and ICITY.
🏡 Mini Cabmond F125-124 – North House January 2024
The doors have been installed successfully.
🏡 Mini Cabmond F125-124 – North House – Bait Al Watan
“December”
- The project has been finished successfully, and only doors are remaining
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “November”
- The finishing of the front facades and the entrance is being completed, and the basement floor is being poured
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “September”
- Electrical work, shell work, exterior material, exterior plumbing work, roof tile work, and installation of staircase marble are underway.
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “Month of August”
- The third and rooftop buildings are being completed, the ground, first, and second electrical works are being established, and the internal conduit works are being established up to the second.
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “July”
- The ceiling columns of the upper roof are being prepared, the second-floor buildings are being worked on, and the electricity and shavings are being prepared for the ground floor.
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “June”
- The ground and first buildings are being completed, the third columns have been poured, and concrete work will resume after Eid
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “Month of May”
- The ceilings of the second floor for the two plots are being prepared
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “April”
- Carpentry work on the roof of the first floor has been completed.
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “Mars”
- Carpentry and blacksmith work is underway for the first columns of the two plots, basement building work is underway and preparations for pouring the first floor are underway.
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “February”
- The ground floor columns have been cast and carpentry work is underway on the ground floor ceiling
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “January”
- Starting the carpentry work on the basement ceiling
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “December”
- The reinforced foundations have been completed and the basement columns are being cast
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “November”
- Work on reinforced foundations
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “October”
- Excavation, replacement, and compaction work are underway
🏡 Mini Cabmond F125-124 – North House – Home of the Nation “September”
- Excavation work is underway
Show more
El Shorouk | Eighth District | Project 249
Under Construction Load more →