A149 North House Bait Al-Watan New Cairo
A149 North House Bait Al-Watan New Cairo, south of the Suez Road. It is distinguished by its geographical location, steps away from the Suez Road and near the club area and the most prestigious urban communities such as: (Sharbatly Villas Compound, Al-Qarfal, Palm Hills, and Mountain View).
Project 149 features
It overlooks a garden
Ground floor and three floors, two apartments per floor only.”
Seafront
Steps from 90th Street
Features of North Beit Al Watan “south of Suez Road”:
Its prime location in front of Shorouk City.
Steps from the (Egypt-Suez) desert road.
It is located just steps from North 90th Street.
Its proximity to New Cairo and the administrative capital.
Steps from Al Ahly Club and ICITY.
🏡 A149 – North Beit Al Watan neighborhood “January 2024”
- The doors have been installed successfully.
🏡 A149 – North Beit Al Watan neighborhood “December”
- The Project has been finished, only the doors remain
🏡 Plot A149 – North Beit Al Watan neighborhood “November”
- The material for the exterior, back and side facades, as well as the marble for the entrance and front façade, are being finished.
🏡 Plot A149 – North Beit Al Watan neighborhood “September”
- Work is underway on the second and third sections, including the roof and electrical works
🏡 Plot A149 – North Beit Al Watan neighborhood “month of August”
- Carpentry and blacksmithing work on columns and roof ceilings is underway.
🏡 Plot A149 – North Beit Al Watan neighborhood “July”
- Casting of the columns of the third floor has been completed, and construction work on the first floor is underway
🏡 Plot A149 – North Beit Al Watan neighborhood “June”
- Building work is underway and the second roof is expected to be poured on Thursday
🏡 Plot A149 – North Beit Al Watan neighborhood “April”
- The ground floor concrete was poured and the fence columns were completed.
🏡 Plot A149 – North Beit Al Watan neighborhood “April”
- The ground floor concrete was poured and the fence columns were completed.
🏡 Plot A149 – North Beit Al Watan neighborhood “Mars”
- Gary Chuen and starting the basement buildings.
🏡 Plot A149 – North Beit Al Watan neighborhood “February”
- Carpentry and blacksmithing work is underway for the basement ceiling and walkways.
🏡 Plot A149 – North Beit Al Watan neighborhood “January”
- Starting the work of the basement columns.
🏡 Plot A149 – North Beit Al Watan neighborhood “December”
- The regular foundations have been completed and backfilling work is underway.
🏡 Plot A149 – North Beit Al Watan neighborhood “November”
- Excavation work is underway.
Show more
El Shorouk | Eighth District | Project 249
Under Construction Load more →
Fifth settlement | Bait Al waten | third District | Project F94
Under Construction Load more →
Stanley
2024-11-25 02:48:20prijs van medicijnen in Den Haag Nihon Torreón Achat medicamentos disponible en vente libre en Espagne Tarbis Cúcuta ligne de médicaments sécurisé