Mini Compound “Al Riyadh Misr 2” North House
Mini Compound “Al Riyadh Misr 2” North House
The mini-compound Riyadh Misr 2 is located in the North Beit Al Watan area, south of the Suez Road. It is distinguished by its geographical location, steps away from the Suez Road and near the club area and the most prestigious urban communities such as: (Sharbatly Villas Compound, Al-Qarfal, Palm Hills, and Mountain View). The width of the street is 30 m, in addition to its proximity to the services area and green areas.
Features of North Beit Al Watan “south of Suez Road”:
Its prime location in front of Shorouk City.
Steps from the (Egypt-Suez) desert road.
Steps from North 90th Street.
Its proximity to New Cairo and the administrative capital.
Steps from Al Ahly Club and ICITY.
Features of Mini Compound Riyadh Egypt 2″
It overlooks the largest garden in Beit Al Watan
Ground floor and three floors, two apartments per floor only.”
Seafront
Steps from 90th Street
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “March 2024”
The work of casting the second door is in progress adding to that electricity working is on progress too.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “February 2024”
The carpentry work on the second roof has been completed, reinforcements are underway, the first-floor buildings are being built and the basement is being filled in (waiting for iron).
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “January 2024”
The working of wood and ironsmith is in the process.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “December 2023”
The first-floor preparation is in progress
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “November 2023”
Carpentry and blacksmith work on basement ceilings is underway
🏡 Mini Cubmond E125-150 – North House – Bayt Al Watan “September 2023”
Casting of reinforced bases, carpentry and blacksmithing of basement columns are underway.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “August 2023”
The work of transporting the equipment and starting the carpentry of the reinforced bases is underway.
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “November”
Excavation, replacement, flooding and compaction work has been completed
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “October”
Excavation, replacement and compaction work is underway
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “September”
Starting excavation work
Show more
Al Shrouk City 8th district 249
Under Construction Load more →
Fairview Complex – Al Shrouk City
تحت الانشاء Load more →
F94 Bait Al Watan – New Cairo
Under Construction Load more →
B129 2nd district Bait Al-Watan New Cairo
تحت الانشاء Load more →
Suzanna
2024-04-23 04:59:31Hello, just wanted to say, I loved this post. It was practical. Keep on posting! Have a look at my web-site :: nakup bupron Morocco medicinske indikacije