The “M82” project is located in the Fifth District, the most prestigious neighborhood in Beit Al Watan, Fifth Settlement
It overlooks the View Zone area, which is considered the vital artery and link between the Beit Al Watan area and the new administrative capital.

 

Fifth District location

The Fifth District overlooks the most prestigious urban communities such as (Palm Hills – Mountain View), and it is the closest neighborhood to the New Administrative Capital, in addition to its proximity to the Suez Road and the Central Ring Road.
The Fifth District is distinguished by its proximity to the Al-Ahly Club and the width of the internal roads is 30 meters, in addition to the latest design of the infrastructure network of “water, electricity, sewage, internet…etc.”

Follow up on project implementation

77%

Delivery time

Days Hours Minutes seconds
M82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New CairoM82 Bait Al Watan - fifth district - New Cairo

🏡 M82 – Fifth District – Beit Al Watan “Month of December”

roof tiles are in progress and the gypsum accessories are preparing

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of November”

The work of plastering the rear and side facades and installing road and studio tiles is underway

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of September”

  • Electrical work is underway on the third floor and the roof and work on the ground floor, first, second, and third floors is underway.

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of August”

  • Works on the third-floor buildings and electrical work on the ground floor and the first floor are underway to start the conch work.

🏡 Plot 82 – Fifth District – Beit Al Watan “July”

The third floor is being dismantled, the third floor buildings are being prepared, and electricity and shavings are being prepared

🏡 Plot 82 – Fifth District – Beit Al Watan “June”

  • Work is underway on the ground and first buildings, and work will resume after Eid
جاري البدء في اعمال النجارة لسقف الدور الثالثجاري البدء في اعمال النجارة لسقف الدور الثالثجاري البدء في اعمال النجارة لسقف الدور الثالثجاري البدء في اعمال النجارة لسقف الدور الثالث

🏡 Plot 82 – Fifth District – Beit Al Watan “May”

  • Carpentry work is underway for the ceiling of the third floor
1- أعمدة الدور الثاني2- أعمدة الدور الثاني3- بناء حوائط الدور الأول - أعمدة خرسانية للدور الثاني4- بناء حوائط الدور الأول - أعمدة خرسانية للدور الثاني5-بناء حوائط الدور الأول - أعمدة خرسانية للدور الثاني

🏡 Plot 82 – Fifth District – Beit Al Watan “April”

  • The concrete for the columns of the second floor has been completed, and preparations are underway for the carpentry of the roof of the second floor.

🏡 Plot 82 – Fifth District – Beit Al Watan “Mars”

  • Carpentry and blacksmith work is underway on the second pillar, ground and first building works are underway, and preparation for casting work is underway.

🏡 Plot 82 – Fifth District – Beit Al Watan “February”

  • Blacksmithing work is underway on the ceiling of the first floor

🏡 Plot 82 – Fifth District – Beit Al Watan “January”

Starting carpentry work on the ground floor ceiling

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of November”

  • Pour regular and reinforced concrete for columns and prepare for making the walker roof

🏡 Plot 82 – Fifth District – Beit Al Watan “October”

  • Start pouring the reinforced bases

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of September”

  • Replacement work has been completed

🏡 Plot 82 – Fifth District – Beit Al Watan “Month of August”

  • Excavation and replacement work