Project 87 is located in the Fifth Settlement Area – the Nardis Area consists of 8 areas where the Nardis Extension Area is newly planned.
The new daffodil “formerly fossilized forest” is the capital of the Fifth Gathering because of its geographical location
It is steps away from Fatima al-Sharbatly Mosque and in front of the German University and the diplomats’ neighbourhood and steps from South 90th Street and near the clubhouse area and the Tulip al-Nardis Hotel
In addition to the Talat War axis linking the Ain Sukhnah Road with the Southern 90th Street.
Main streets offer 20 m in addition to close proximity to service area and green areas.
Narcissus Extension Features:
The Narcissus overlooks the German architecture and university and salutes diplomats.
Steps from South 90th Street and Talat War axis.
Proximity to the service area and the world’s most famous malls
Al Nardis District is a group of hospitals, schools and international universities
The latest design of the internal and external road network.
G87 – Al Narges – New Cairo – Construction update of March 2024
Installation of facade stone and staircase marble is underway.
G87 – Al Narges – New Cairo – Construction update of February 2024
The first used interior plastering and ladder work is underway, and the exterior scaffolding (the background and those) is being written and the roof tiles are being installed.
G87 – Al Narges – New Cairo – Construction update of January 2024
The internal wall and roof finishing is in the process.
G87 – Al Narges – New Cairo – Construction update of December
working on the interface of the building and the wall of the third floor is in progress and the roof
G87 – Al Narges – New Cairo – Construction update
“November 2023”
Mourning, carpentry, and pouring of the third columns and barium and ground buildings are underway
G87 – Al Narges – New Cairo – Construction update
“September 2023”
Blacksmith works are underway and the first roof is poured with the front part reinforced to the basement floor until concrete heart tests are carried out.
G87 – Al Narges – New Cairo – Construction update
“August 2023”
Pour land poles and carpentry ground roof.
G87 – Al Narges – New Cairo – Construction update
“July”
Commencement of carpentry rooftop works and completion of Salafist fence buildings
G87 – Al Narges – New Cairo – Construction update
“June”
In the process of isolating rules and censorship to catch up with your blood and blood before Eid
G87 – Al Narges – New Cairo – Construction update
“May”
Bases are equipped
G87 – Al Narges – New Cairo – Construction update
“April”
Drilling work has been completed and preparation is underway.
Show more
Al Shrouk City 8th district 249
Under Construction Load more →
Fairview Complex – Al Shrouk City
تحت الانشاء Load more →
F94 Bait Al Watan – New Cairo
Under Construction Load more →
B129 2nd district Bait Al-Watan New Cairo
تحت الانشاء Load more →
Clemmie
2024-04-17 12:42:21Hi, always i used to check webpage posts here in the early hours in the morning, as i enjoy to gain knowledge of more and more. Also visit my page :: minopac sans ordonnance livrée en France