C176 Project Al Narges Al Gdida

أرقي-شقق-للبيع-في-مشروع-176-في-حي-النرجس-الجديدة-التجمع-الخامس-الرياض-مصر
Publish date 2021-03-08

C176 Project Al Narges Al Gdida

Project “176” location:

The “176” project is located in the Fifth Settlement area – the Narges area consists of 8 areas, where the Narges extension area was newly planned – and the new Narges, “the former petrified forest”, is considered the capital of the Fifth Settlement due to its geographical location.

It is just steps away from Fatima Sharbatly Mosque and in front of the German University and the Diplomatic Quarter.
It is steps away from the southern 90th Street and close to the club area and the Tulip Narges Hotel, in addition to the Talaat Harb axis, which connects Ain Sokhna Road to the southern 90th Street.
The width of the main streets is 20 m, in addition to its proximity to the services area and green areas.

 

 

Advantages of Narcissus Extension:

It overlooks the Narges buildings, the German University, and the Diplomatic Quarter.
Steps from South 90th Street and Talaat Harb Axis.
Its proximity to the services area and the most famous international malls
The Narges neighborhood is located in the middle of a group of international hospitals, schools, and universities
The latest design of the internal and external road network.

Follow up on project implementation

86%

Delivery time

Days Hours Minutes seconds
C176 Project Al Narges Al Gdida-4C176 Project Al Narges Al Gdida-1C176 Project Al Narges Al Gdida-2C176 Project Al Narges Al Gdida-3

The New Narges, the construction update of

“January”

The additional work is in process and delivery is expected to be this week

Project C176 - The New NargesProject C176 - The New NargesProject C176 - The New NargesProject C176 - The New NargesProject C176 - The New NargesProject C176 - The New Narges

The New Narges, the construction update of

“December”

The project is in the latest progress.

Only the doors are remaining.

Plot C 176 – Narcissus Extension “November”

Facade material work is underway, installing road tiles, guard room, installing aluminum and crystal, and planning the garage.

🏡 Plot C 176 – Narcissus Extension “September”

Work is underway to plaster the front façade, marble the entrance, and buildings, plaster the garden dividers, and level the basement.

🏡 Plot C 176 – Narcissus Extension “Month of August”

The interior shell work for the third floor, the roof, the skylight shell, the left and right facades are being completed, and the roof insulation materials are being supplied.

🏡 Plot C 176 – Narcissus Extension “July”

The exterior plastering work on the facades is underway, the staircase marble work is underway, and the surface is being prepared for insulation

🏡 Plot C 176 – Narcissus Extension “June”

Internal plastering and electrical work for the stalagmites and studios are underway, and there is still a general excavation in front of the piece that hinders the entry of raw materials.
And the works of the conch, the back facade and the left side, in addition to the works of the fences.

جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176جاري اعمال المحارة الداخلية واعمال الكهرباء C176

🏡 Plot C 176 – Narcissus Extension “May”

Internal shell and electrical works are underway

نصف تشطيب- محارة أسمنتية2- نصف تشطيب- محارة أسمنتية3- نصف تشطيب- محارة أسمنتية4- الانتهاء من بناء الأساس، والبدء في بناء الحوائط5- الانتهاء من بناء الأساس، والبدء في بناء الحوائط6- الانتهاء من بناء الأساس، والبدء في بناء الحوائط7- الانتهاء من بناء الأساس، والبدء في بناء الحوائط8- الانتهاء من بناء الأساس، والبدء في بناء الحوائط9- الانتهاء من بناء الأساس، والبدء في بناء الحوائط

🏡 Plot C 176 – Narcissus Extension “April”

The entire concrete structure work has been completed and the internal shelling work is underway on the ground, first and second floors

🏡 Plot C 176 – Narcissus Extension “March”

Work is underway on the second and Chuen buildings, the third buildings and its inner shell are being worked on, and the roof and roof columns have been poured.

🏡 Plot C 176 – Narcissus Extension “February”

Work is underway on the buildings of the second floor, the interior shell of the ground and first floors, and the carpentry and ceiling of the third floor.

🏡 Plot C 176 – Narcissus Extension “January”

Starting the work of the second floor columns and preparing to cast the second floor columns.

🏡 Plot C 176 – Narcissus Extension “December”

Describe the roof of the ground floor and the buildings of the external walls

🏡 Plot C 176 – Narcissus Extension “November”

Basement roof work is underway

🏡 Plot C 176 – Narjis Extension “October”

Start pouring the basement columns

🏡 Plot C 176 – Narcissus Extension “September”

Blacksmithing work is underway

🏡 Plot C 176 – Narcissus Extension “August”

Excavation and replacement work is underway