Mini Compound “Al Riyadh Misr 2” North House
Mini Compound “Al Riyadh Misr 2” North House
The mini-compound Riyadh Misr 2 is located in the North Beit Al Watan area, south of the Suez Road. It is distinguished by its geographical location, steps away from the Suez Road and near the club area and the most prestigious urban communities such as: (Sharbatly Villas Compound, Al-Qarfal, Palm Hills, and Mountain View). The width of the street is 30 m, in addition to its proximity to the services area and green areas.
Features of North Beit Al Watan “south of Suez Road”:
Its prime location in front of Shorouk City.
Steps from the (Egypt-Suez) desert road.
Steps from North 90th Street.
Its proximity to New Cairo and the administrative capital.
Steps from Al Ahly Club and ICITY.
Features of Mini Compound Riyadh Egypt 2″
It overlooks the largest garden in Beit Al Watan
Ground floor and three floors, two apartments per floor only.”
Seafront
Steps from 90th Street
Mini Compound E125-150 – North House – Beit Al Watan, October 2024.
Work is underway to complete the front facades, construct the pump rooms, supply marble for the entrance, and carry out the formwork and steel reinforcement for the pump room ceiling.
Mini Compound E125-150 – North House – Beit Al Watan, september 2024.
The installation of marble stairs for both buildings is nearing completion, and the finalizing of plaster repair and facades is being done. Plumbing works for the basement are in progress, and the installation of stone cladding on the front façade and balconies is also ongoing.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “August” 2024
Now the backside interface is under development and working on the tile, adding to that the ground roof installation, and the marble of the stairs to finish the building interface.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “July” 2024
In the Finishing phase of walls
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “June” 2024
Casting of elevator rooms and completion of the rooftop and third buildings are in the process
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “May” 2024
The third roof mourning work and the first and second oysters work are under way
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “April 2024”
Carpentry work is underway on the roof of the third, painting of the buildings of the second, and plastering work on the basement and ground floor.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “March 2024”
The work of casting the second door is in progress adding to that electricity work is on progress too.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “February 2024”
The carpentry work on the second roof has been completed, reinforcements are underway, the first-floor buildings are being built and the basement is being filled in (waiting for iron).
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “January 2024”
The working of wood and ironsmith is in the process.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “December 2023”
The first-floor preparation is in progress
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “November 2023”
Carpentry and blacksmith work on basement ceilings is underway
🏡 Mini Cubmond E125-150 – North House – Bayt Al Watan “September 2023”
Casting of reinforced bases, carpentry and blacksmithing of basement columns are underway.
🏡 Mini Cabmond E125-150 – North House – Beit Al Watan “August 2023”
The work of transporting the equipment and starting the carpentry of the reinforced bases is underway.
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “November”
Excavation, replacement, flooding and compaction work has been completed
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “October”
Excavation, replacement and compaction work is underway
🏡 Mini Cupboard E125-150 – North House – Home of the Nation “September”
Starting excavation work
Show more
El Shorouk | Eighth District | Project 249
Under Construction Load more →
Fifth settlement | Bait Al waten | third District | Project F94
Under Construction Load more →
Coy
2024-11-12 12:11:19приснились все родственники умершие вместе снилась молодая девушка в белом совместимость женщины козерога и мужчины водолея в любви в процентах снятся ли кошкам их хозяева причастие без молитвы my web-site; оберег от рака своими руками